EverLine operates one of North America’s most advanced third-party control centers, providing 24×7 monitoring, control, and on-call support with redundant infrastructure engineered for safety and reliability.
Plant and grid operators face a complex landscape: volatile markets, skilled labor shortages, aging assets, and increasingly strict compliance requirements. The EverLine Remote Operations Control Center (ROCC) is designed specifically to address these challenges.Our ROCC is more than just a control room—it acts as the central nervous system for your assets. Covering transmission, generation, renewables, and OEM fleets, EverLine delivers 24/7 monitoring, predictive diagnostics, and redundant disaster recovery failover systems that minimize downtime, cut costs, and ensure compliance.
.png)
Transmission Operations
Transmission Operations
Real-time monitoring and control of transmission assets
NERC-CIP compliant redundancy between two data centers
Fault detection and reliability in SCADA/OT networks
Generation Operations
Generation Operations
Complete visibility into nuclear, coal, gas, wind, solar, and BESS facilities
Support for dispatch, performance reporting, and market participation
Emergency response and audit-verified compliance resilience
Renewable Operations
Renewable Operations
Integration of wind, solar, hybrid, hydrogen, and energy storage assets
Platform-independent SCADA integration across all major systems
Dedicated team managing over 10 GW of assets
Renewable Operations
OEM Monitoring
Comprehensive oversight of OEM assets with complete redundancy.
Centralized visibility across fleets to improve uptime and reduce costs.
Validated resilience through 15+ state and federal audits.
Why EverLine ROCC?
Why EverLine ROCC?
World-class infrastructure: dual physical sites, redundant systems, dedicated backup generators.
Unmatched expertise: 50+ experienced operators supporting assets in 15+ states and offshore.
Cost efficiency: outsourcing to EverLine reduces costs vs. building and staffing internal control centers.
Proven reliability:Nearly 30% of major outages now last over 24 hours, and incidents costing more than $100,000 are becoming increasingly common. EverLine ROCC keeps your operations resilient against this growing risk.
How Everline Works
Assess current program & operations
Identify gaps & corrective actions
Implement documents & procedures
Train managers, SMEs, and plant personnel
Establish reporting & periodic filings
Reassess (onsite/virtual), update quarterly
One Partner for Reliability and Resilience
One partner for compliance and remote operations. Connect with EverLine and have the industry’s most trusted NERC andROCC team perform for you.
EverLine delivers the intelligence, infrastructure, and expertise to helpoperators maintain compliance and keep power flowing. Whether you need abest-in-class NERC program or a full remote operations solution, we bringtrusted experience, proven systems, and measurable results.